Skip to content
Back to Projects

Hydropower Project
Pakistan

This run-of-river hydropower scheme in Pakistan suffered a collapse of the outlet tunnel shortly after watering up.

Geo-Design were commissioned by insurers to carry out an independent assessment of ground conditions and site records to determine the cause of collapse of a section of the outlet tunnel. The tunnel was located under moderate to high cover in variable rock mass conditions.

Sector: Water – hydropower, insurance.

  • Geological and hydrogeological evaluation
    Independent evaluation of the rock mass conditions and construction records. Opinion on the rock mass and support failure mechanisms.
  • Root cause analysis
    Consideration of the engineering and technical causes of the tunnel failure.
Frame Copy

Facing a rock engineering challenge? We’re here to help.

Get in touch