Highway Tunnels
Middle East

Sector:
Civils – transport tunnels.

This highway tunnel project comprised four tunnels with a combined length of 3.5km, excavated below a live highway and other civil infrastructure.  The £270M value contract included large span crossover caverns and maintenance room complexes.

Geo-Design produced a detailed reference design for complex urban highway tunnels and caverns with spans up to 33m, with very shallow cover in bedded sedimentary rocks:

  • Site investigation specification
    Suitable ground investigation data to enable design.
  • Alignment geological model
    Development of detailed geological models of the route alignment.
  • Detailed reference design
    Construction sequence, temporary support, instrumentation and monitoring.
  • Structural design
    Detailed design of the final lining in 2D and 3D.
  • Specification
    Input to specification including ground risk mitigation and sharing.
Frame Copy

Facing a rock engineering challenge? We’re here to help.