Channel Tunnel Rail Link – North Downs Tunnel, UK

Client: RAIL LINK ENGINEERING (UK)

Review and design input of a single bore 3.2km long, 14m span tunnel through chalk rocks. Specialist input on discontinuous rock mass response in weak rocks during construction stage. Design analyses and provision of support recommendations.

This project was posted in Rail, Tunnels.

Comments are closed.