Thesavros Hydropower and Irrigation Scheme, Greece

Engineering Geological and Rock Mechanics Studies for the Foundation of the Platanovrisi, Despati and Nestos Bridges.  Bridge structures were a total length of   300m long with pier heights up to 60m, situated across a reservoir, on steeply sloping ground.  Foundations were generally on piles extending to heavily tectonised and foliated granitic gneisses.  Assessment included investigation and detailed design.

This project was posted in Foundations, Water & Hydropower.

Comments are closed.