Tai Koo Cavern – Mass Transit Railway – Island Line, Hong Kong

Client    MTRC and HASWELL  (Hong Kong)

Construction and long term design assessment for major station cavern in weathered granite (28m span x 250m long).  Assessment of excavation conditions, design of cavern lining, study and evaluation of overhead hillside excavation effects, long term performance monitoring.

Site assessment and design of underground rock excavations for major concourse development in weathered granite with integrated piling structures.

Taikoo Cavern Construction Problems - Hong Kong